Fieldpark Interiors was appointed as the interior fit-out specialist for a major upgrade and extension to Ipsen Biopharm’s manufacturing facility in Wrexham, a leading site for the production of specialty care medicines in oncology and neurological disorders. The facility upgrade required an uncompromising approach to hygiene, precision, and compliance with Good Manufacturing Practice (GMP) and ISO cleanroom standards.

This complex, live-environment project demanded specialist knowledge in high-performance interior systems for cleanrooms and controlled environments. Fieldpark delivered a full package of drylining, plastering, suspended ceilings, and steel framing systems, coordinating closely with the client’s M&E and process contractors to meet rigorous technical and regulatory standards.

Scope of Works

Drylining Systems:
• High-density and moisture-resistant board systems throughout sterile and cleanroom zones
• Robust internal partitions integrating seamlessly with HVAC and M&E services
• Bespoke service penetrations with airtight seals and flush-mounted access

Plastering Solutions:
• Smooth, skimmed plaster finishes in public circulation zones and offices
• Anti-microbial coatings applied in line with healthcare and lab hygiene standards
• Rounded corner details for particle control and clean ability

Suspended Ceilings:
• Fully sealed walk-on MF and grid ceilings in cleanrooms
• Integrated lighting, air filtration, and fire-stopping solutions
• Acoustic-rated systems for offices, labs, and collaboration areas

SFS (Steel Framing Systems):
• Structural steel framing to form external envelope of the new extension
• Wind and weatherproof solutions pre-cladding
• Fire-rated assemblies as required for regulatory compliance

Key Achievements

Cleanroom Readiness:
Interior systems delivered to the highest GMP and ISO cleanroom standards, critical for pharmaceutical production.

Complex Coordination:
Flawless integration with building services and specialist equipment under tight tolerances.

Live Site Delivery:
Works executed in a phased schedule to maintain continuous operation of key facility areas.

Engineering Precision:
All framing and ceiling systems delivered with laser-accurate setting out and survey integration.

“Fieldpark Interiors brought a high level of professionalism, flexibility, and technical skill to this critical infrastructure upgrade. Their commitment to quality and cleanroom compliance played a key role in the successful delivery of our expansion.”
Facilities Director, Ipsen Biopharm Ltd

Completion & Value

  • Completion Date: December 2024
    Project Value: £1.8M
    Package Duration: 34 Weeks

Why This Project Matters

  • Supports Ipsen’s strategic growth in the biopharma sector
    • Enables production scale-up for global distribution of life-changing therapies
    • Sets a benchmark in pharmaceutical interior fit-out for controlled environments
    • Demonstrates Fieldpark’s ability to deliver in critical, high-stakes environments

Precision-engineered cleanrooms

Compliance-led installation

Seamless technical integration

Project Details

Clients : David Copper

Project Date : 13 Sep 2019

Location : USA – 1060 Firs

Avenue End Date : 05 Oct 2019

Price After : 1350$

Related project

Let’s See Popular Projects

Burnley University Extension at Newtown Mill

Burnley University Extension at Newtown Mill£500k Interiors Package | Part of £6.6M ExpansionFieldpark…