C-Gull Building

C-Gull Building outside

C-GULL Building – Ground Floor Refurbishment

Cancer Research Centre

Fieldpark Interiors Ltd was appointed to deliver the specialist interior refurbishment works to the ground floor of the C-GULL Building at the University of Liverpool Cancer Research Centre. The project forms part of a wider investment to modernise healthcare and research facilities, creating a high-quality, functional environment for staff and visitors.

The refurbishment focuses on transforming the existing space into a contemporary reception and waiting area, incorporating upgraded internal layouts, coordinated services integration and premium interior finishes suitable for a sensitive research setting.

About the Works

The C-GULL Building refurbishment demonstrates Fieldpark Interiors’ capability in delivering high-specification interior environments within sensitive healthcare and research settings. The project required careful planning, precise coordination and a considered approach to acoustic performance, finishes and services integration.

Project Scope

• Metal Stud Partitions & Drylining

Installation of bespoke metal stud partition systems to form reception, waiting and support areas. All systems were installed to meet required fire, acoustic and performance standards appropriate to a healthcare research environment.

• Suspended Ceiling Systems

Supply and installation of suspended ceiling systems, fully coordinated with lighting, ventilation and access requirements, delivering both functional performance and a high-quality architectural finish.

• Acoustic Performance Solutions

Integration of acoustic wall and ceiling solutions to reduce noise transfer and enhance comfort levels within public-facing areas.

• Plastering & Internal Finishes

High-quality plastering and finishing works to walls and ceilings, providing smooth, durable surfaces prepared for final decoration in line with healthcare standards.

• Bespoke Joinery Interfaces

Coordination and integration of bespoke timber screens and feature elements, ensuring seamless alignment with Fieldpark-installed partitions and ceilings.

• M&E Services Coordination

Close coordination with mechanical and electrical trades to ensure all Fieldpark-installed systems accommodated lighting, ventilation and service penetrations without compromise to fire or acoustic performance.

Key Project Features

✔ Specialist healthcare and research interior refurbishment

✔ High-quality reception and waiting environment

✔ Bespoke detailing and premium finishes

✔ Delivered within a live research facility

✔ Strong coordination with building services and stakeholders

Sector: Healthcare & Research

Location: Liverpool

Quality Service Provider

Commercial Services

Residential services

Project Details

Clients : David Copper

Project Date : 13 Sep 2019

Location : USA – 1060 Firs

Avenue End Date : 05 Oct 2019

Price After : 1350$

Related project

Let’s See Popular Projects

Runshaw College

Runshaw CollegeRunshaw College  Windermere BuildingScience Teaching Facility | Leyland, LancashireThe Windermere Building forms…

Life Sciences Building University of Liverpool

Life Sciences Building University of LiverpoolLife Sciences Building  University of LiverpoolInterior Refurbishment |…

University of Manchester  Kilburn Building

University of Manchester  Kilburn BuildingKilburn Building – University of ManchesterOxford Road, ManchesterThe Kilburn…