University of Manchester Kilburn Building
University of Manchester Kilburn Building
Kilburn Building – University of Manchester
Oxford Road, Manchester
The Kilburn Building is home to the University of Manchester’s Department of Computer Science, providing accommodation for teaching, collaborative learning and specialist computing activities.
Refurbishing interiors within an established university building requires careful consideration of how the spaces will be used. Room layouts, finishes and building services must work together to create practical accommodation that supports students and staff.
About the Works
Fieldpark Interiors Ltd carried out internal partitions, plastering, suspended ceilings and acoustic raft installations as part of the building’s interior refurbishment.
The package brought together the formation of internal spaces, surface finishing and ceiling treatments. Careful detailing at junctions with existing construction helped create a consistent finish, while acoustic rafts contributed to sound control within the designated areas.
Project Scope
- Internal Partitions – Installation of partition systems to form the approved internal layouts, with detailing around doors, openings and adjoining construction.
- Suspended Ceilings – Installation of suspended ceiling systems within the specified areas, accommodating the requirements of the interior design.
- Plastering – Plastering and finishing of wall surfaces to create smooth, consistent backgrounds ready for decoration.
- Acoustic Rafts – Installation of suspended acoustic rafts in designated spaces to absorb sound and help reduce reverberation.
Interior refurbishment within an established university building
Accommodation supporting Computer Science activities
Internal partitions forming the revised layouts
Suspended ceilings and acoustic rafts
Smooth plaster finishes ready for decoration
Sector: Higher Education
Location: Kilburn Building, Oxford Road, Manchester
Quality Service Provider
Commercial Services
Residential services
Project Details
Clients : David Copper
Project Date : 13 Sep 2019
Location : USA – 1060 Firs
Avenue End Date : 05 Oct 2019
Price After : 1350$

